The Hungarian Public Roads Toll Division’s new, in-house toll planner will be available starting Sunday

For the time being, operators of heavy-duty vehicles and buses with a gross weight of over 3.5 tonnes can plan their routes using the official toll planner based on current rates, but will soon also be able to do so using the rates applicable from 2027. The partial service outage affecting the M6 motorway will also end on Sunday.

The Hungarian Public Roads Toll Division’s new toll and route ticket planner will be available starting Sunday, 29 November 2026, at the tervezo.hu-go.hu website. In addition to route and toll planning, the platform will also allow the purchase of route tickets, making it useful for both operators of goods motor vehicles and buses using on-board units (OBUs) and those using route tickets.

The Hungarian Public Roads Toll Division’s new toll and route ticket planner is the only official toll planning interface for the domestic toll system, also accessible from the hu-go.hu website by clicking the “Toll Calculator and Route Ticket” button.

The official toll planner platform combines the advantages of the toll calculator and the HU-GO route ticket purchase interface used up till now, and on the new site, users can, for the time being, plan routes using current rates, but will soon be able to do so using rates applicable from 2027 as well. We will announce the date of the latter at our toll-charge.hu website.

The new interface follows a consistent planning logic—it plans the fastest route based on travel time—for both road users with an on-board unit (OBU) and those holding a route ticket. Of course, if the addresses specified during planning are located in the same or neighbouring counties, the planner will route the trip along the shortest path, taking weight restrictions into account. Furthermore, the new planner will also allow users to configure the interface to prioritise the transit route network specified in the relevant legislation for the fastest route, regardless of the route. The interface provides up-to-date and accurate tracking of changes to the Highway Code and access restrictions, and notifies the user if the planned route includes any restrictions applicable to the selected vehicle.

The interface will be a much more state-of-the-art, easier-to-use, and customer-friendly solution compared to its predecessor, and will be launched in English and German languages in addition to Hungarian.

Starting 29 November, tolls will be charged on the M6 motorway between Ivándárda and the country border

With the launch of the new toll planner interface, the partial service outage affecting the 2.5-km long section of the M6 motorway between Ivándárda and the country border will come to an end. Accordingly, starting on Sunday, 29 November 2026, road users will be required to declare their road use regarding this expressway section and pay a toll.

Pursuant to Decree No. 25/2013 (V. 31) NFM of the Minister of National Development on the amount of the toll and toll roads, the section of the M6 motorway between Ivándárda and the country border was added to the list of basic tolled sections under the distance-based e-toll collection system with effect from 1 July 2026.

From this date on, the Hungarian Public Roads Toll Division announced a partial service outage on the aforementioned short expressway section for vehicles with a maximum authorised total mass exceeding 3.5 tonnes, so these vehicles have not yet been required to declare their road use or pay tolls.

The partial service outage did not affect the e-vignette system; the section of the M6 between Ivándárda and the country border has been subject to a toll for passenger vehicle drivers since 1 January 2026.